View Single Post
  #644 (permalink)  
Old 05-09-2008, 12:24 AM
ChicagoRob ChicagoRob is offline
Junior Member
 
Join Date: Mar 2008
Posts: 18
ChicagoRob is on a distinguished road
Oh well

Quote:
Originally Posted by ChicagoRob View Post
I have two tests running: one with a 2.0 multiplier, and one with a
1.75 multiplier. What's strange is the max lot size for both tests is
1.00. According to my math, 1.00 lots doesn't fit into either progression.
It appears that the EA won't go beyond this number. Anyone else
seeing the same thing?

Rob
Stupid me. I went into the code and found that MaxLots was
set to 1.

Rob
Reply With Quote