View Single Post
  #25 (permalink)  
Old 03-22-2008, 07:09 AM
zenocorp zenocorp is offline
Junior Member
 
Join Date: Jun 2007
Posts: 3
zenocorp is on a distinguished road
how can i run 2 charts at the same time?

lets says i want to do simulation for the month of February 2008 and i want to do it on GU 1 hour and 4 hours time frame. how can i run both charts at the same period of time?
Reply With Quote